welcometo欢迎光临888集团(电子游戏)官网·Unique Platform

  • Basf R&D Service Platform Integration Project

    Basf R&D Service Platform Integration Project
      The project is located in Pudong New Area, Shanghai, with a total construction area of 94,000 square meters and a total cost of 320 million yuan. The project has been awarded the Shanghai Magnolia Award and LEED Award.
    • CITIC Guojian Pharmaceutical Research and Development Experimental Center and Production Workshop Project

      CITIC Guojian Pharmaceutical Research and Development Experimental Center and Production Workshop Project
        The first phase of the project covers an area of 28000 square meters with a frame of 3-5 floors, including production workshops, office and scientific research buildings and ancillary buildings. The workshop area is 17879_and the steel concrete frame is three stories. The cleaner zones produced are 100,000, 10,000 and 100 local grades. The office and scientific research buildings have an area of 8627 feet and a frame structure of 5 floors. Phase II covers an area of 28900 square meters with a frame of 5 floors. GMP certification. The project has been awarded the Shanghai Installation Quality Structure Site Visit Site, Shanghai "Pujiang Cup".
      • Tianjin IKEA Logistics Center

        Tianjin IKEA Logistics Center
          Located in Tianjin Airport Economic Zone, the project has a total floor area of 75,000 square meters and is a two-storey steel structure building. The project has been awarded Tianjin Civilized Construction Demonstration Site.
        • Office Building and Workshop of Feike Electrical Appliance Headquarters

          Office Building and Workshop of Feike Electrical Appliance Headquarters
            The project is located in Guangfulin Road, Songjiang District, Shanghai, with a total floor area of 160,000 square meters. The project has been awarded Shanghai Civilized Construction Site and Shanghai Quality Project.
          • General Motors Golden Bridge Assembly Workshop and Transmission Workshop

            General Motors Golden Bridge Assembly Workshop and Transmission Workshop
              The total construction area of the project is 116,000 square meters. The first floor of frame steel structure in assembly workshop and the third floor of frame rigid structure in transmission workshop. The project has been awarded the Shanghai Civilized Construction Site for Major Projects, the Shanghai Meritorious Competition Award for Major Projects, and the China Golden Steel Award for Steel Structure.
            • Shanghai Electric Port-vicinity Heavy Machinery Equipment Manufacturing Base Joint Workshop Project

              Shanghai Electric Port-vicinity Heavy Machinery Equipment Manufacturing Base Joint Workshop Project
                The total construction area of the project is 93,000 square meters. Single-storey and multi-span heavy steel structure factory building, the superstructure is heavy steel structure with a span of 43 meters, the maximum weight of single truss column is 110 tons, the total amount of steel used is as high as 33,000 tons, and the crane installed in the factory building is 700 tons. Has been awarded Shanghai Civilized Construction Site.